page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39 page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
page 136
page 137
page 138
page 139
page 140
page 141
page 142
page 143
page 144
page 145
page 146
page 147
page 148
page 149
page 150
page 151
page 152
page 153
page 154
page 155
page 156
page 157
page 158
page 159
page 160
page 161
page 162
page 163
page 164
page 165
page 166
page 167
page 168
page 169
page 170
page 171
page 172
page 173
page 174
page 175
page 176
page 177
page 178
page 179
page 180
page 181
page 182
page 183
page 184
page 185
< prev - next > Energy Hydro power civil_works_guidelines_for_micro_hydro (Printable PDF)
CIVIL WORKS GUIDELINES FOR MICRO-HYDROPOWER IN NEPAL
37
Photo 3.11 Gabion walls at the headworks of the 30kw Jharkot
micro-hydro scheme, Mustang, Nepal.
It is important that the culvert beneath the trash rack is steep
enough to convey the maximum conceivable sediment load
to the gravel trap: a gradient of at least 1:20 is recommended.
The gravel trap may require continuous flushing, which means
that sufficient head and surplus flow has to be available. The
design must be able to carry and spill back to the river the
maximum flow entering the intake under flood conditions.
Engineers designing a bottom intake should refer to
References 3 and 5 for further information.
3.8 River training works
A flood protection wall along the riverbank may be required if
there is a high probability of flood damage to the initial headrace
and other structures such as the gravel trap and settling basin.
Such walls are also called river training structures since they
confine the river channel. The wall height should be greater
than or at least equal to the design flood level.
The foundation of any river training walls must be protected
from undermining by the river. This can be done by one of the
following methods.
Founding the wall on rock or large boulders. For gabion
walls it may be necessary to first build up a level base using
stone masonry or mass concrete.
Founding the wall below possible scour depth.
Using a gabion mattress along the river side of the wall.
This method is not appropriate in rivers carrying a heavy
bed load, because the gabion wires will be damaged by
boulders moving during floods.
On alluvial rivers (i.e. deep deposition of sand and cobbles),
gabion flood protection walls are usually more appropriate
for micro-hydro scheme. This is because the ground of
alluvial rivers tends to change and flexible structures can
cope better in such conditions. Gabion walls may require
annual maintenance (especially after monsoon) therefore
skilled manpower should either be available at site or some
local people should be trained during the construction phase.
Gabion walls can also serve the function of retaining walls
and stabilise the slopes behind it. If slopes at the alluvial
riverbank are unstable, then gabion walls can also be
designed as retaining walls. Photograph 3.11 shows the use
of a gabion wall to stabilise the bank slope. Refer to Section
9.4 for retaining wall design. On stable riverbanks, such as
exposed bedrock, a masonry wall can be built provided that
the river does not carry large boulders that could damage
masonry structures. In large hydropower and irrigation projects
even concrete flood barrier walls are used but usually such
solutions are economically unjustifiable for micro-hydro
schemes. Figure 3.15 shows the use of a gabion wall to prevent
the river bypassing the diversion weir and damaging the
headrace pipe during floods.
3.9 Checklist for diversion works
Refer to Table 3.1 and find out what category the source
river falls in.
Refer to Table 3.2 and decide on whether a side intake or a
bottom intake is suitable.
Is a weir required or is it possible to divert the river water
without one? Remember the concept of “minimal
disturbance to the natural state of the water”.
Does the river course appear stable or does it look like it will
meander? Think about flood and flood levels. Also, if the
river carries large boulders during the floods, and a weir is
required, think about temporary diversion works rather than
a permanent weir.
To minimise flood damage the intake location should be
such that it is possible to set the headrace alignment
immediately away from the river course.
If a side intake has been selected along a river bend,
remember to locate it on the outside of the bend.
Have the flood levels and history of the river course been
discussed with the local community members?
Finally, consider the cost of different options. Is it more
economic to construct temporary diversion works and incur
some annual labour charges or to choose more permanent
diversion works?